Tank and Wells Project

Schedule 1 – Sheepherder Tank Control Valve Building – Will control water flow to and from the Sheepherder Tank on the Upper Pressure Zone. The building will be installed on near West Spring Creek Road between Two Mile Drive and Three Mile Drive.

  • Contractor is S&L Underground
Schedule 1 Tanks and Wells Diagram
Schedule 1 Tanks and Wells Axon View Looking Sout-East

Schedule 2 – 1 Million Gallon Elevated Water Storage Tank and Well – Includes the construction of a 1MG elevated storage tank in the Upper Pressure Zone, well building, and completion of a Public Water Supply well. The project site is located adjacent to and east of US Hwy 93, approximately 0.6 miles north of Rose Crossing.

  • Contractor is Landmark Structures
Schedule 2 Tanks and Wells Diagram

Schedule 3 – Four Mile Drive Water Well – Includes the construction of a well building and completion of a Public Water Supply well. The project is located adjacent to and south of Four Mile Drive approximately 0.5 miles west of Stillwater Road.

  • Contractor is S&L Underground
Schedule 3 Tanks and Wells Diagram

Schedule 4 – North Main Well – Includes the construction of a well building and completion of a Public Water Supply well which services the Lower Pressure Zone. The project is located adjacent to North Main Street near the entrance of Buffalo Hills Golf Course.

  • Contractor is S&L Underground
Schedule 4 Tanks and Wells Diagram